We – EPG Group the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing unit in China with 5 diverse branches. For far more details: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
divided tower jack-up concrete inserting boom with 29m and 33m positioning radius
Tower Column hydraulic jack-up concrete placing growth, Self-climbing kind, climbing by floor frame or by shaft frame. Mostly used for concrete inserting of construction venture, like civil construction, plant development, bridge building, beam garden, nuclear electricity plant, infrastructure, etc.
Charactics
Modular design, mechanical and electrical integration manage, folding growth, tube column, floor frame and shaft body. Integration of advanced characteristics and item diversification, to accomplish a greater merchandise portfolio, improve the applicability of the item.
Imported hydraulic and electrical factors, adopt top quality fa EPT coupling for hydraulic pipelines, which is converted speedily, it can successfully resolve the issue of oil leakage in the method of assembling and dismantling, and stay away from the air pollution of the atmosphere. Safety and trustworthiness
sections R type hydraulic increase, large circular arc, novel and stunning appearance, compact structure, and the light-weight style of the boom, which lowered the excess weight of the complete device..
Easy to transportation and put in.
Geared up with self-climbing frames which are pushed by hydraulic and which climb up immediately from the present flooring to the wanted flooring alongside the holes at first geared up in elevator well, the putting booms rise with the climbing ground, saving time and labor.
Attributes
A.Growth
The arced boom structure is optimized by applying CPU design. The boom adopted high-strength steel plate for production with scientific process. It features beautiful appearance, superior rigidity and intensity, ensuring excellent and reliable quality.
B. EPT program
C series products adopted Germany Rexroth solenoid directional control valve and balance valve
with secondary overflow. It has effectively avoided the potential damages of boom
which might be caused by over speed movement when the boom drops down, and sudden
increase of oil cylinder’s pressure under external forces, thus the reliability of the boom
has been increased.
C.Internal EPT Oil Tank
Inner hydraulic oil tank renders a compact structure and free swivel. It gives big
convenient for installation, dismounting and maintenance, which ensure longer service
life and excellent performance.
D.Climbing Facility
As a rectangular frame structure, the climbing facility is flexible, reliable and convenient
for dismounting.
E.Slewing Mechanism and Reducer
Slewing reducer adopted products made by the world famous brand of Italy Comer, with
a great torsion. Being accompanied with the integrated slewing balance valve made by
Germany Hawei, it achieves smooth operation and reliable and stable performance.
F.Wi-fi Remote Controller
C series products adopt industry-exclusive analogue wireless remote controller made by ZheJiang TELECRANE, which is easy and convenient to operate, highly resistant to
disturbance and reliable in performance.Each series are accompanied with wired remote controller for use in necessity.
G.Electric Control Technique
The electric control system adopted world famous brand of electric components, such
as Japanese Omron and French Schneider. The multi automatic protection is set up in
the control program, so as to avoid misoperation and ensure the system’s reliability.
H.Column
The column is made of high-strength steel plate in square shape, with nice appearance,
rigidness and intensity, as well as high reliability.
Option:
u Inner-climbing frames: Ground frames or Wall frames(Shaft frames)
u Column: 2m-10m.
u Mode of slewing: Gear slewing or rack & Bearing of stepless slewing.
u Voltage: 380V/50Hz or 440V/60Hz
u Radio remote Control: Tele Crane HBC or AUTEC
29m Tower Jack-up Concrete Placing growth Requirements:
Model | Models | HGY29C | ||
Performance | Max.radius of positioning growth | m | 28.nine | |
Freestanding top (to the joint among the end of the increase and swivel table) | m | 22.7 | ||
Boom articulation | ° | 400 | ||
Slewing brake | / | always shut | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total bodyweight | kg | 19100 | ||
Counter weight | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor | Model | / | Y2-160M-four | |
Power | kW | eleven | ||
EPT method |
Pressure | MPa | 30 | |
Flux | l/min | eighteen | ||
EPT oil |
Circumstance temperature 35ºC-50ºC | / | L-HM 68 | |
Circumstance temperature 5ºC-35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
Control method |
/ | Limited-haul Control /radio distant handle | ||
Pipeline cleaning | / | Soaked cleaning/Dry cleaning |
||
Structure of tower entire body | / | Tubular column | ||
Section of tower entire body | m×m | .75×0.75 | ||
Boom |
Shape | / | 3 hydraulic foldable arms | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1 EPT area | Duration | m | 11.5 | |
Articulation | ° | 0°~eighty two.5° | ||
2nd segment | Length | m | 9.three | |
Articulation | ° | 0°~180° | ||
3rd section | Duration | m | 8.one | |
Articulation | ° | 0°~180° | ||
Climbing |
Climbing mode | / | By hydraulic cylinder climbing |
|
Interval of climbing | m | .fifty two | ||
Floor frame | / | Hole well prepared in ground |
||
Shaft frame | m | Gap well prepared in flooring 2.~2.seven |
||
Min.Interval of climbing frame | Climbing | m | three. | |
Positioning concrete | m | six. | ||
Relaxation | m | 6.0 |
29m Putting BoomWorking Selection :
33m Tower Jack-up Concrete Inserting increase Requirements:
Model | Units | HGY33E | ||
Performance | Max.radius of placing growth | m | 33 | |
Freestanding peak (to the joint in between the stop of the growth and swivel table) | m | 22.seven | ||
Boom articulation | ° | four hundred | ||
Slewing brake | / | usually shut | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total weight | kg | 21200 | ||
Counter fat | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor |
Model | / | Y2-160L-4 | |
Power | kW | fifteen | ||
EPT program |
Pressure | MPa | 30 | |
Flux | l/min | 18 | ||
EPT oil |
Circumstance temperature 35ºC-50ºC | / | L-HM 68 | |
Circumstance temperature 5ºC-35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
Control method | / | Quick-haul Management /radio remote handle | ||
Pipeline cleansing | / | Soaked cleansing/Dry cleaning |
||
Structure of tower physique | / | Tubular column | ||
Section of tower entire body | m×m | .75×0.75 | ||
Boom |
Shape | / | 3 hydraulic foldable arms | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1 EPT segment |
Length | m | twelve.38 | |
Articulation | ° | 0°~eighty two.5° | ||
2nd segment | Size | m | ten.93 | |
Articulation | ° | 0°~180° | ||
3rd part |
Duration | m | nine.69 | |
Articulation | ° | 0°~180° | ||
Climbing |
Climbing mode | / | By hydraulic cylinder climbing | |
Interval of climbing | m | .52 | ||
Floor body | / | Hole well prepared in flooring | ||
Shaft body | m | Hole geared up in ground two.~2.seven |
||
Min.Interval of climbing frame | Climbing | m | 3. | |
Inserting concrete | m | six. | ||
Relaxation | m | 6.0 |
33m Putting BoomWorking Assortment :
Tower Column Concrete Positioning Growth Set up:
Tower Putting Growth Job web site Overall performance:
We – EPG Team the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing unit in China with 5 different branches. For a lot more details: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828 The use of original gear manufacturer’s (OEM) component quantities or emblems , e.g. CASE® and John Deere® are for reference functions only and for indicating solution use and compatibility. Our company and the shown substitute areas contained herein are not sponsored, accepted, or created by the OEM.